Network: All Hospitals
Ctrl K
Inspect
Runs and health
HCA UK selected supply footprint
Run health Warn
Run reliability
Current run health and source coverage- Run
- 05 May, 07:00
- Run health
- Warn
- Items evaluated
- 950
- Lots evaluated
- 2,800
- Recommendations
- 22
- Completed
- 05 May, 08:00
Fresh 234Stale 20Missing 4Partial 2
Pass 18Warn 2Fail 2
Model operations
Business lift, action quality, source drift, and release stability checks completed before queue publication.- Release
- May 2026 demand cycle revision 1
- State
- Active with source exceptions
- Calibration window
- 04 Feb 2026 to 05 May 2026
- Last replay
- 05 May, 08:00
- Rollback
- Previous approved weekly run
| Check | State | Observed | Threshold |
|---|---|---|---|
| Input drift | Stop | 26 source fields outside freshness target; exceptions remain represented in the queue. | No missing required fields for top recommendations; stale fields require queue-visible exception basis. |
| Calibration replay | Pass | 240 item-site forecasts replayed across the active calibration window. | Replay must complete before the weekly queue is released to operators. |
| Decision guardrails | Review | 5 decisions are below the active confidence floor and require review. | Every decision must carry the approved policy revision, demand cycle, action basis, and confidence floor result. |
| Rollback readiness | Pass | Previous approved weekly run remains available with policy and forecast basis. | Rollback point must exist before policy or forecast changes can replace an operating run. |
Run health
inventory snapshot freshnessReviewinventory snapshot freshness has isolated exceptions represented in the queue edge cases.
item-to-lot join coveragePassitem-to-lot join coverage passed for the current weekly run.
expiry-date coveragePassexpiry-date coverage passed for the current weekly run.
unit-cost coveragePassunit-cost coverage passed for the current weekly run.
ownership-status coverageReviewownership-status coverage has isolated exceptions represented in the queue edge cases.
hospital-owned / consignment separabilityPasshospital-owned / consignment separability passed for the current weekly run.
usage-history coveragePassusage-history coverage passed for the current weekly run.
demand-signal availabilityPassdemand-signal availability passed for the current weekly run.
transfer-history coveragePasstransfer-history coverage passed for the current weekly run.
write-off-history coveragePasswrite-off-history coverage passed for the current weekly run.
reserve-policy coveragePassreserve-policy coverage passed for the current weekly run.
constraint coverage for top recommendationsPassconstraint coverage for top recommendations passed for the current weekly run.
active threshold configurationPassactive threshold configuration passed for the current weekly run.
provenance coverage for top recommendationsReviewprovenance coverage for top recommendations has isolated exceptions represented in the queue edge cases.
no duplicate open packet for same lot/actionPassno duplicate open packet for same lot/action passed for the current weekly run.
Run comparison
Pre/post run comparison- Prior run
- RUN-SUP-2026-04-28-0700
- Current run
- RUN-SUP-2026-05-05-0700
- Recommendation delta
- 20
- Value-at-risk delta
- £529.8k
- Recoverable delta
- £204.1k-£281.5k
| Item | Prior | Current | Action |
|---|---|---|---|
| Vascular closure device | New | 1 | Transfer |
| Arthroscopy pump cassette | New | 2 | Transfer |
| Electrophysiology introducer sheath | New | 3 | Transfer |
| Single-use sterile instrument tray | New | 4 | Escalate |
| Implant-adjacent fixation kit | New | 5 | Transfer |
| Endovascular retrieval set | New | 6 | Escalate |
| Orthopaedic drill sleeve pack | New | 7 | Transfer |
| Cardiac mapping catheter accessory | New | 8 | Transfer |
| High-flow insufflation tubing | New | 9 | Monitor |
| Sterile biologic prep kit | New | 10 | Hold due to constraint |
| Oncology infusion set | New | 11 | Escalate |
| Robotic procedure drape pack | New | 12 | Transfer |
Approval trail
Run created - CompletedPriya Shah, Network Inventory Control Lead05 May, 08:00
Recommendation created - NewPriya Shah, Network Inventory Control Lead05 May, 08:00
Recommendation created - NewPriya Shah, Network Inventory Control Lead05 May, 08:00
Recommendation created - NewPriya Shah, Network Inventory Control Lead05 May, 08:00
Recommendation created - NewPriya Shah, Network Inventory Control Lead05 May, 08:00
Recommendation created - NewPriya Shah, Network Inventory Control Lead05 May, 08:00
Recommendation created - NewPriya Shah, Network Inventory Control Lead05 May, 08:00
Recommendation created - NewPriya Shah, Network Inventory Control Lead05 May, 08:00
Recommendation created - NewPriya Shah, Network Inventory Control Lead05 May, 08:00
Recommendation created - NewPriya Shah, Network Inventory Control Lead05 May, 08:00
Recommendation created - Review RequiredPriya Shah, Network Inventory Control Lead05 May, 08:00
Recommendation created - NewPriya Shah, Network Inventory Control Lead05 May, 08:00
Event recorded with actor and status basis.New eventReason: Scheduled Weekly Run
Event recorded with actor and status basis.New eventReason: Run Materialized
Event recorded with actor and status basis.New eventReason: Run Materialized
Event recorded with actor and status basis.New eventReason: Run Materialized
Event recorded with actor and status basis.New eventReason: Run Materialized
Event recorded with actor and status basis.New eventReason: Run Materialized